The function of the equipotential bonding bus bar is to galvanically connect all the conductive parts and extraneous conductive parts present or which could enter in the patient environment. In this way, if a conductive part malfunction occurs, all the conductive parts will have the same potential and the patient, who may be in contact with two or more conductive parts, is not subject to hazardous currents.
Equipment to be connected to the SEB:
Electrical equipment
· All conductive parts and the extraneous conductive parts that are located in the patient environment, or which may enter it during use
· Equipotential receptacles
· Surgical light
· Operating tables
· Electrical booms and pendants
None electrical equipment
· Metal screens to reduce EMC fields
· Conductive grids and screens of the floor
· Water piping, metal drains,
· Medical gas piping and booms/pendants
· Metal and supporting fixtures
Metal furniture units and metal parts of furnishing do not have to be connected to the SEB.
The screen of the IT-System transformer and the protective earth conductor of the branch circuits shall be connected via the shortest way to the PE inside the Isolated Power System (IPS).
The function of the equipotential bonding bus bar is to galvanically connect all the conductive parts and extraneous conductive parts present or which could enter in the patient environment. In this way, if a conductive part malfunction occurs, all the conductive parts will have the same potential and the patient, who may be in contact with two or more conductive parts, is not subject to hazardous currents.
Equipment to be connected to the SEB:
Electrical equipment
· All conductive parts and the extraneous conductive parts that are located in the patient environment, or which may enter it during use
· Equipotential receptacles
· Surgical light
· Operating tables
· Electrical booms and pendants
None electrical equipment
· Metal screens to reduce EMC fields
· Conductive grids and screens of the floor
· Water piping, metal drains,
· Medical gas piping and booms/pendants
· Metal and supporting fixtures
Metal furniture units and metal parts of furnishing do not have to be connected to the SEB.
The screen of the IT-System transformer and the protective earth conductor of the branch circuits shall be connected via the shortest way to the PE inside the Isolated Power System (IPS).
· Equipotential bonding of all conductive parts in a patients -environment according IEC 60364-7-710
· For testing purpose each circuit can be tested without removing the actual conductor
· Reserved space for clamp on current meters
· To accommodate up to 16 mm² solid conductors or up to 25 mm² fine stranded conductors
· Direct push in of the conductor, no screws
· Easy wiring, no crimping tools or torque wrenches for wiring required
· No retightening of the conductor/terminal during inspection
· Tin-plated bus bar, none corrosive
· Self-adhesive label with a wiring list for clear conductor identification
· Wall box with bezel frame or surface mounted enclosure
Type | Terminals | Weight | Mounting |
---|---|---|---|
SEB30, UPB type, Article No. BF22302201 | 30 | 7.7kg | flush |
SEB30-AP, AP type, Article No. BF22302203 | 30 | 10kg | surface |
SEB60, UPB type, Article No. BF22302202 | 60 | 13.7kg | flush |
SEB60-AP, AP type, Article No. BF22302204 | 60 | 15kg | surface |
Name | Typ | Größe | Sprache | Zeitstempel | D-/B-Nummer |
---|---|---|---|---|---|
SEB30, SEB60 Datasheet | Datenblätter | 1.2 MB | EN | 2024/08/2828.08.2024 |